Even Platinum buildings waste cooling
A Green Mark Platinum plaque shows how a building was designed, not how much cooling it wastes today. Why even the best buildings still have savings to find.

A Green Mark Platinum plaque tells you how a building was designed. It doesn't tell you how much cooling it wastes today.
When I offer to cut a building's air-conditioning energy, I often hear: "We're already Platinum. There's nothing left to save."
I understand why. Those buildings did the hard work. But a certificate is a photo of the building on one day. Cooling waste is a film that runs every day after.
What happens after the plaque
- Equipment ages. Units that were efficient on day one aren't on year ten.
- Tenants change. New layouts, more people, more screens, meeting rooms where open space used to be.
- Setpoints drift. A complaint here, a degree there. Nobody puts it back.
None of that shows on the plaque. All of it shows on the bill.
Even the best buildings had room
At Keppel Bay Tower, Singapore's first Green Mark Platinum zero-energy commercial building, we equipped an entire floor with Continewm in under 30 minutes.
At LogisTech, a Green Mark Platinum Super Low Energy building, our pilot for the CapitaLand Sustainability Challenge cut the energy use of its air-handling units by up to 51%.
If these buildings still had savings to find, most buildings do.
Why it matters now
Since September 2025, Singapore's Mandatory Energy Improvement regime requires energy-intensive buildings of 5,000 m² or more to cut their energy use intensity by at least 10%.
Air-conditioning is often around half of a commercial building's energy. A 25% cut on cooling, our average across installations, is around 12% for the whole building. That's the 10% target from one change.
Four signs your building has drifted
- Your certification is more than five years old.
- Energy use is creeping up while occupancy stays flat.
- The setpoint is lower than the design value.
- You're near the top of BCA's benchmark for your building type.
How we check
We start with one floor or one air-handling unit. We measure its air-conditioning consumption, install Continewm in a few minutes per unit with no shutdown, and send you a report after two to four weeks. Then you decide.
Your turn: when was your building last certified, and has its energy use gone up since? Write to us and tell us. I'd like to know how many readers are in the same situation.